( )is a measure of schedule performance expressed as the difference between the earned value and the planned value.

  • ASchedule variance (SV)
  • B Cost variance (CV)
  • CActual cost (AC)
  • DEarned value (EV)
参考答案: A
解题思路: 进度差异(SV) 是进度绩效的度量,表示为挣值与计划值之差。2021.05>>>立即刷题